Pipeline (SFR)

Preston

Active Member
#1
A 36-inch gas pipeline is in the process of being laid across the NF Stillaguamish about a half mile above the confluence with the SF at Arlington. A portable cofferdam has been installed from the north bank channeling all of the river to the south bank at the present time. The project is expected to be completed by the end of next week. If you're planning to float the NF next week, watch out for it.